WEIRTON STEEL OVERPASS, located in Hancock County, West Virginia. 2 Level 4
The tenure of this list will be one (1) year, beginning November 1, 2019 through October 31, 2020. The anticipated duration of the agreement is twelve months coincident with the calendar year 2018 with the potential for a (mutually agreeable) twelve-month extension. cost rate are in accordance with the FAR cost principles, or a verification
Location shall be based on the geographic location of the Consultants office relative to the project site along with past experience and knowledge of the area where the project site is located with the significant importance being given to accessibility of the office location relative to the Department. Notice
have 13 girder spans, 11 piers, and two abutments with an overall length of
It is scheduled for letting in August 2014. West Virginia Department of Transportation, Division of Highways, I-64Widening: Hal Greer Blvd to 29th Street. Alternates:
Survey data will be provided to the consultant, but some additional survey may be needed. Any potential subconsultant must be included on the list of prequalified consultants for applicable Prequalification Category (Engineering Division). 54-0626, and Bid for Appraisal Servicesfor Project F-157(9), Lease No. The work will generally consist of the preparation of, but not necessarily be limited to, contract plans (signing, traffic signal, pavement markings and roadway lighting), traffic impact studies, traffic engineering studies, Intelligent Transportation System (ITS) projects (planning studies, systems engineering and contract plans), incident management planning, highway safety improvement projects (studies, crash data analysis, Highway Safety Manual analysis and contract plans), project or program management and review services, asset and data management assistance to support traffic data programs as well as other related services. 6. Inspection Manual, Federal Highway Administration Underwater Bridge Inspection
State Project S354-68-17.07 00, Sen. JF Deem Memorial Bridge, which carries West Virginia Route (WV) 68 over the Little Kanawha River, United States Route (US) 50, 1st Street, 2nd Street, and CSX Railroad. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide natural resource services for compliance with the Endangered Species Act, USACE guidelines and related requirements pertaining to roadway and bridge projects in West Virginia. Statewide Transportation Improvement Program, Governing Statutes, Legislative, and Procedural Rules. Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for protective coatings inspection for various projects throughout the state. The structures
Bids for Appraisers and Appraisers Review Services for State Project X302-51-5.18 00 Berkeley County. private industry in terms of cost control, quality of work, and compliance with
This advertisement replaces the advertisement on June 24, 2019. This list of prequalified Consultants will be made available on the WVDOH website. This project shall consist of the development of National Environmental Policy Act (NEPA) documentation in support of a West Virginia Department of Transportation Design Study. Highways, that Disadvantaged Business Enterprises (DBE) shall have the maximum
Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for various materials testing, inspection, quality assurance, documentation services, and related duties as required on various projects for all 10 Districts of the State. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide noise analysis services for compliance with highway traffic noise prediction requirements, noise analyses, noise abatement criteria as contained in revised Title 23 U S Code of Federal Regulations Part 772 ( 23 CFR 772 ), Procedures for Abatement of Highway Traffic Noise and Construction Noise effective July 13, 2011. Phase 2 will be from the westbound ramps of WV 279 (MP 2.20) to 0.20 mile south of the I-79 northbound ramp (MP 3.72). A single
This project is being developed as a Public-Private-Partnership utilizing Design-Build procurement. It is anticipated that five (5) appropriately accredited and qualified inspectors (three Level Ill, two Level Il) for the area of assignment will be required. ** PLEASE BE AWARE OF REVISIONS HIGHLIGHTED WITHIN THE AD BELOW ** 9/12/18
Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that Right of Way consultant services related to transportation projects will be used for negotiation, relocation, replacement housing, property management, cemetery relocation, and other right of way activities necessary for statewide projects for fiscal year July 1, 2015 through June 30, 2016. The work will be performed statewide on all Interstates, APD and NHS routes, and selected US, West Virginia, and county routes in addition to other non-continuous road sections that include the Highway Performance Monitoring System (HPMS). The purpose of this Request for Qualifications (RFQ) is to solicit letters of interest and qualifications from firms interested in providing the services described in this RFQ. The bridge consists of fourteen continuous welded deck girder spans with an overall length of 2,383 feet in length. Hundred Fifty Thousand Dollars ($250,000.00). project (Morgan County). CHARLESTON The West Virginia Division of Highways plans to use $150 million in supplemental funding requested by Gov. The QAM will certify all materials and inspection on the project and provide record keeping to document certifications. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide cultural resource services for compliance with Section 106 of the National Historic Preservation Act. concrete median. NFA-0017(085),Project PM09-4-MONO-1 and Project PM08-4-MONO-5, Bid for Appraisal and Appraisal Review Services for State Projects S331-857-10.20, Fed. NEPA clearance will be assumed to be handled in-house by the Technical Division. and all eliminations required by the Federal Acquisition Regulations will be
A Design Study has been completed and will not be a part of these services. This list of prequalified Consultants will be made available on the WVDOH website and will be open for submission of qualifications through July 31, 2021. prospectus are required and must contain all the above information required to
Bid for Appraisal and Appraisal Review Services for State Project S317-19-26.19, Fed. The bridge consists of eleven spans with a total length of 2,530 feet. - 1 Level III inspector
This list of prequalified Consultants will be made available on the WVDOH website. The anticipated duration of the agreement is approximately 55 months. This list of prequalified Consultants will be made available on the WVDOH website and will be open for submission of qualifications through July 31, 2019. The work generally consists of structural inspections, preparation of contract plans and related documents. Prior to entering any contract
Bids for Appraisers and Appraisers Review Services for State Project X341-125-0.02 00Federal Project DE-0062(824)TRaleigh and SummersCounties. This list of prequalified Consultants will be made available on the WVDOH website and will be open for submission of qualifications through July31, 2021. Manual, AASHTO Manual for Bridge Evaluation, West Virginia Department of
00, Rt. 27-0615. Type of work anticipated to be
Bids for Appraisal Services andAppraisal Review Services for State ProjectPM10-4-MONO-2, ReBids for Second Appraisals for State Project S323-10-16.20 00, Federal Project EOAP-0010(213)D. Bids for Appraisal Review Servicesfor State Project N081-BLD/GR-0.00,PM# GRAN0009. Phase 3 will be from the intersection of WV 131 with United States (US) Route 50 (MP 0.00) to the intersection of CR 50/32 with WV 131 (MP 0.92). These programs include Congestion Mitigation and Air Quality, Off-system Bridge Program, Transportation Alternatives and the Recreational Trails Program. The anticipated duration of the agreement is approximately 36 months. Multiple consultants will be selected. According to the release, the bridges are in the 40-mile stretch between Lost Creek in Harrison County and . The work will be performed statewide upon specific requests by the Division of Highways and may include, but not necessarily be limited to; stream and wetland studies, state and federal listed endangered species investigations, non-listed species surveys and biological surveys, and other related services. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized for providing all types of surveying including, but not limited to, conventional, GPS, Remote Sensing, Hydraulic and Hydrology, as well as Subsurface Utility (SUE) at various locations throughout the State for highway, bridge or miscellaneous projects. The purpose of this Request for Qualifications (RFQ) is to solicit letters of interest and qualifications from firms interested in providing the services described in this RFQ. It must also identify the person in-charge overseeing
The structure contains nineteen approach spans and one main span and is approximately 50 x 1428. It must specifically indicate the staff levels by classification located in-state vs. out-of-state. is hereby given by the West Virginia Department of Transportation, Division of
1 CPM Schedule Reviewer
The anticipated duration of the agreement is twenty-four months coincident with the calendar years 2023 & 2024 with the potential for additional (mutually agreeable) twelve-month extensions. This project shall consist of the development of a Design Study and all related environmental surveys and documentation required to complete the NEPA process and obtain environmental clearance. Any potential subconsultant must be included on the list of prequalified Consultants for the applicable Prequalification Category (Engineering Division). Failure to
Post Design Services will be by separate Agreement. It is anticipated that the following appropriately accredited and qualified inspectors will be required:
This form may be found on the follow website:
Other improvements but not limited to in the project (corridor) include many Smart Road technologies such as sensors to monitor changing road conditions, Wi-Fi transmitters that provide broadband services to vehicles, homes and businesses, glowing pavement markings, interactive lights, cameras for traffic lights, bike lanes and sidewalks, utility relocations, installation of broadband, greenspace features and lighting enhancements, crosswalk enhancements and pedestrian lighting, electric charging stations, stormwater management (rain gardens), and various pavement materials. Further project details are located at. Timeline: July 15, 2019-second quarter 2023 Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Assurance Management (QAM) services and related duties as required on various Design-Build projects throughout the State. Failure to provide the required information and/or insufficient information will cause disqualification and the prospectus will be returned. The work may include field paint inspections, corrosion surveys, identification of candidate structures for maintenance painting, and related duties as required on multiple construction projects throughout the state. Selected:
Crossovers and a contraflow lane will be required to maintain two (2) lanes of traffic in each direction. prospectus. Post Design Services will be by separate Agreement. BR-0009(146)E,Project PM Lease #12-0704and State Project X341-125-0.02, Fed. State Project S320-RAN/D-21. 1 TRETTR (Level 1)
Thrasher- Only Construction/Materials Oversight for Three Buildings Listed Below. It is anticipated that appropriately accredited and qualified inspectors, Levels I-IV, for the area of assignment will be required. New Enterprise Stone & Lime
The structures to be inspected are located throughout the state, over a variety of water conditions, roadways, railroads, etc., and will be designated by the District or Operations Division. Post Design Services, if required, may be by a separate Agreement. These projects alone will add up to $208 million-worth of improvements to West Virginia's roads. Successful Consultants must be capable of performing 51% of the work as the prime Consultant. provided. It is anticipated that the WVDOT Study will analyze multiple alternatives, which may include bridge replacement/renovation, tunnel rehabilitation/closure, and bridge abandonment/demolition with an upgrade to existing routes and/or structures. The West Virginia Department of Transportation, Division of Highways (DOH) seeks to construct a four-lane section of US 35 between WV 859 in Putnam County and CR 40 in Mason County using the Design-Build procurement method. Project AB, VECELLIO & GROGAN
already on file. Consideration shall be given to specialized experience and
Multiple consultants will be selected. through Nine) has a total of nine spans made up of a five-span continuous
subconsultant when its portion of the fee for the project is less than Two
It is anticipated that appropriately accredited and qualified inspectors, Levels I-V, for the area of assignment will be required. prospectus is not acceptable. The nine-span structure is approximately 1,383 feet long with a 450-foot main span. Notice is hereby given by the West Virginia Division of Highways (WVDOH), Planning Division, that consulting services will be utilized to provide planning services for various programs and miscellaneous projects. No. A completed copy of the Divisions Consultant Confidential Qualification Questionnaire, if not already on file, dated January 1, 2019 or later. The work will generally consist of strategic planning, enterprise implementation, data management including creation, collection, conversion, and reporting, and training. One loose leaf copy of form is to accompany the bound unpriced prospectus. continuous section. Successful Consultants must be capable of performing 51% of the work as the prime Consultant. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that individual service contracts related to transportation projects will be used for negotiations, relocation, and replacement housing appraisals for statewide projects for the fiscal year July 1, 2012 through June 30, 2013. Indication of the project(s) for which the firm is submitting information for consideration.If the submission is for all projects, a statement to that effect shall be made and a detailed listing shall not be required. BILCO Construction
That person
1 - CPM Schedule Reviewer, Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Control and Quality Assurance project inspection, documentation services, project management, and related duties as required on the I-79 Bridge Rehab project (Harrison, Marion, & Monongalia County).
Black Motorcycle Clubs In Ohio,
Tsa Canine Handler Interview,
Articles W